Tech company · District 3
A team of 28 planning 8 new hires this year. The test fit showed the floor fits the full hiring plan plus 2 meeting rooms and a pantry. The client signed the lease a week later.
Share your floor plan. Within 2–3 working days, Timi Office sends a preliminary layout, an estimated seat count and the key points to check before you pay the deposit.
Companies that planned their office with Timi Office
Seat counts, meeting-room placement and fit-out costs are estimated from offices Timi has actually delivered – not from a generic formula.
Planning for today’s headcount only and forgetting upcoming hires – the office feels cramped soon after moving in.
An empty floor looks spacious, but columns, cores and floor shape make meeting rooms and pantry hard to place.
Two floors of the same size can differ by several seats because of column grid and window positions.
Extra partitions, HVAC changes, power upgrades – discovered after signing, when the budget is already set.
A concise PDF your CEO, HR and Admin teams can review together and decide.
Reception, workstations, meeting, private rooms, pantry.
Today and for your 12–24 month plan.
Daylight, circulation, room to grow.
Columns, dead zones, service cores that reduce usable area.
Power, HVAC, fire safety, building rules.
In person or online, walking through every assumption.
Every company has different needs. This is how Timi answers “will it fit?”.
A team of 28 planning 8 new hires this year. The test fit showed the floor fits the full hiring plan plus 2 meeting rooms and a pantry. The client signed the lease a week later.

Both floors were 350 m². Floor A, with 4 central columns and an off-centre core, fit 38 seats; the regular floor B fit 46. The client chose floor B and used the results to negotiate rent.

The client needed 30 seats, but with a meeting room the 180 m² floor fit 22 at most. They paused the deposit and moved to a 250 m² floor – avoiding a wrong 3-year lease.
All we need is your floor plan and headcount. Timi takes care of the rest.

CAD/PDF, or just the building and floor. Headcount, meeting rooms, private offices.

A short call to agree on requirements and scope, about 30 minutes.
A PDF with layout, seat count, pros and cons, and items to verify.

We explain every assumption. You decide whether to lease.
You are considering one specific space.
⏱ 2–3 working days
Share your floor plan →Comparing 2–3 shortlisted spaces, needing a budget or a report for management or HQ.
⏱ 5–10 working days
Ask about the studyYou have chosen the space and need an office ready to move in.
⏱ Per project schedule
View our work →| Under 200 m² | VND 2,000,000 |
| 200 – 400 m² | VND 3,500,000 |
| 400 – 600 m² | VND 5,700,000 |
| 600 – 800 m² | VND 7,800,000 |
| 800 – 1,000 m² | VND 9,300,000 |
| 1,000 – 1,200 m² | VND 11,200,000 |
| 1,200 – 1,400 m² | VND 14,000,000 |
| Over 1,400 m² | On request |
Per floor plan, up to 3 floor plans per study. The study does not replace technical design, fire-safety submissions or legal due diligence. Reports available in English.
The team behind your test fit also designs and builds. No need to brief a new contractor from scratch.

Clients decide faster when they can see their future office.
Fill in the form, then send your drawing by email or Zalo. We will contact you within 4 working hours.